Projects

HAWAIʻI LAND & POWER's projects, as facts: name, island, technology, capacity, status, the procurement or docket each sits in, and the counterparty. Schedules are not published.

Current Projects Under Development

Current Projects Under Development
ProjectIslandTechnologyCapacityStatusProcurement or docketCounterparty
Harborside Generating StationOʻahuDual-fuel reciprocating engines88.51 MWIn developmentHawaiian Electric Integrated Grid Planning RFP, Docket No. 2024-0258Hawaiian Electric Company
Alahao Firm GenerationHilo, Hawaiʻi IslandDual-fuel reciprocating engines30 MWIn developmentHawaiian Electric Integrated Grid Planning RFP, Docket No. 2024-0258Hawaii Electric Light Company
Alahao Energy StorageHilo, Hawaiʻi IslandBattery energy storage20 MW / 120 MWhIn developmentHawaiian Electric Integrated Grid Planning RFP, Docket No. 2024-0258Hawaii Electric Light Company
Kauaʻi Integrated Waste Processing FacilityKauaʻiMunicipal solid waste processing with renewable fuel production and energy recovery≈100,000 tons of MSW per yearIn developmentCounty of Kauaʻi XRFP No. 2025-XRFP-4, Technology for Long-Term Management of Municipal Solid WasteCounty of Kauaʻi

Status: In development · Selected · Under contract · Operating · Prior role

Harborside Generating Station

Harborside Generating Station is an 88.51 MW firm generation project on Oʻahu, proposed in Hawaiian Electric's Integrated Grid Planning RFP. HL&P first proposed the site in the Stage 3 RFP in 2023. The engine basis is Wärtsilä dual-fuel reciprocating engines.

Concept rendering of Harborside Generating Station on Oʻahu: engine hall, stacks, fuel tanks inside a containment berm, and the switchyard
Concept rendering. Imagery: Google, Airbus
Concept rendering of Harborside Generating Station and its interconnection line to the Campbell Estate Industrial Park substation
Concept rendering. Imagery: Google, Airbus

Alahao Firm Generation and Alahao Energy Storage

Alahao Firm Generation is a 30 MW firm generation project, and Alahao Energy Storage a 20 MW / 120 MWh battery storage project, on a Department of Hawaiian Home Lands industrial parcel at Panaʻewa, adjacent to Hawaii Electric Light's Kanoelehua substation, under a right-of-entry the Hawaiian Homes Commission approved in February 2025. The engine basis is Wärtsilä dual-fuel reciprocating engines.

Concept rendering of Alahao Firm Generation and Alahao Energy Storage at Panaʻewa, Hilo: engine hall and stack, fuel tanks, battery yard, and switchyard beside the Kanoelehua substation
Concept rendering. Imagery: Google, Airbus
Concept rendering of the Alahao site seen from the road: the switchyard in front, with the engine hall, fuel tanks and battery yard behind
Concept rendering. Imagery: Google, Airbus

Kauaʻi Integrated Waste Processing Facility

In the County of Kauaʻi's two-step procurement, 2025-XRFP-4, HL&P leads the development team, with Mālama One Recycling, for a facility that would process the County's municipal solid waste and make renewable diesel and naphtha from it.

Prior Roles

Prior Roles
ProjectIslandTechnologyCapacityStatusProcurement or docketCounterparty
Puʻuloa Energy and Puʻuloa SolarOʻahuRenewable firm generation; solar with storage99 MW; 6 MW / 24 MWhAmeresco projects; HL&P development partnerStage 3 RFP, Docket No. 2017-0352; Puʻuloa Solar PPA approved in Docket No. 2025-0436Hawaiian Electric Company
Hu Honua BioenergyHawaiʻi IslandBiomass generation23.5 MWPrior role of HL&P's Principal: acquired the plant from C. Brewer in May 2005, performed the initial refurbishment assessment, negotiated with Hawaii Electric Light Company to restart it as a qualifying facility, and sold a majority interest in 2008.—Hawaii Electric Light Company

— : not yet published.

The people who carry the work. Team